Extension, Menai Bridge

Case Study 2


  • Michael & Vicky Eyrie

Nature of Project:

  • Single storey sunroom extension in Menai Bridge
  • Construction consisting of 100mm block work cavity system, with 50mm foil backed insulation board
  • Added steel structure for strength & load bearing properties, finished internally with a board skim finish & a buttermilk external K rend texture

Features including:

  • Edm rubber roofing
  • Underfloor heating thermostatically controlled
  • Gun metal grey coated aluminium box style bi-folding doors, 32mm toughened self cleaning & tinted glazing, argon cavity fill, ultra low threshold
  • Ceiling joists filled with 150mm foiled insulation
  • Electric pavilion sliding roof, rain sensor glass
  • All passed & approved in staged inspections by LABC (Ynys Môn County Council)
  • Duration of project - 6 weeks


"We just want to thank you and your fabulous team for such careful attention to our beautiful home! We couldn't be happier"